{"id":9994,"date":"2022-06-09T14:18:50","date_gmt":"2022-06-09T07:18:50","guid":{"rendered":"https:\/\/memientrung.vn\/?p=9994"},"modified":"2022-06-09T14:18:50","modified_gmt":"2022-06-09T07:18:50","slug":"acceptance-and-supervision-of-electrical-works","status":"publish","type":"post","link":"https:\/\/memientrungvn704.chiliweb.org\/en\/service\/acceptance-and-supervision-of-electrical-works.html","title":{"rendered":"Acceptance and supervision of electrical works"},"content":{"rendered":"
To ensure the quality of the work, the monitoring and acceptance is very important. This work must be done closely and throughout from the beginning to the completion of the work:<\/p>\n
I. STEPS FOR ACCEPTANCE OF ELECTRICAL WORKS<\/strong><\/p>\n Consists of 3 steps:<\/p>\n II. COOLING WORKS:<\/strong><\/p>\n Legal documents include:<\/p>\n 1. Testing and acceptance of medium voltage lines:<\/strong><\/p>\n 2. Substation acceptance test:<\/strong><\/p>\n + Power metering system, circuit diagram.<\/p>\n + The total and branch circuit-breakers: check the closing and breaking operations, the allowable breaking current value.<\/p>\n + Check the working grounding system, low voltage lightning escape system.<\/p>\n 3. Testing and acceptance of low-voltage lines:<\/strong><\/p>\n 4. Testing and acceptance of switchgear:<\/strong><\/p>\n 4.1. Testing and acceptance of segment cutting station:<\/strong><\/p>\n 4.2. The work of acceptance of the load knife:<\/strong><\/p>\n 4.3.Isolation knife acceptance test:<\/strong><\/p>\n III. ELECTRICAL COLLECTION WORKS:<\/strong><\/p>\n After overcoming all the shortcomings detected in the cold acceptance step, which means that the whole project has met the operating standards and conformed to the design, the hot acceptance test of the project will be carried out.<\/p>\n Acceptance and energization of the works for the purpose of comprehensively general inspection of the work to see if it ensures the operational specifications of the works, to see if there are any shortcomings and errors that the cold acceptance test did not detect. out.<\/p>\n When taking over and energizing, it is mainly checking and observing technical parameters of equipment and power grid shown on the metering system and protective relay system.<\/p>\n 1. Acceptance and energization of medium voltage lines:<\/strong><\/p>\n 2. Testing and acceptance of energizing substations:<\/strong><\/p>\n 3. Acceptance and energization of low voltage lines:<\/strong><\/p>\n IV. ACCEPTANCE HANDLING WORK OF CONSTRUCTION ASSETS:<\/strong><\/p>\n After energizing for 24h or 72h safe acceptance and after clearing all shortcomings, the construction unit will hand over the work and guide the operation to the operation management department to receive from the investor.<\/p>\n The parties who sign to confirm the safe energizing and load testing work agree to complete the acceptance test and put the work into operation. The investor is responsible for managing and operating in accordance with the electrical equipment process, according to the equipment operating instructions of the manufacturer.<\/p>\n","protected":false},"excerpt":{"rendered":" To ensure the quality of the work, the monitoring and acceptance is very important. This work must be done closely and throughout from the beginning to the completion of the work: I. STEPS FOR ACCEPTANCE OF ELECTRICAL WORKS Consists of […]<\/p>\n","protected":false},"author":2,"featured_media":9947,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[131,124],"tags":[],"yoast_head":"\n\n
\n
\n
\n
\n
\n
\n
\n
\n
\n
\n
\n